The road is classified as an urban expressway and is configured as an expressway mainline with arterial-class frontage roads provided at selected locations. The Works comprise mainline bridge and tunnel sections; one interchange (the Huancheng South Road Interchange) and four pairs of entry/exit ramps are provided along the entire alignment. The frontage road commences in the north at a point south of Gongye Avenue and terminates in the south at the planned Jing'er Road.